Project Overview
Design and supply of an equipment upgrade for a lobster purging and live holding facility, holding lobster prior to live export to Asia.
System Size
Recirculating seawater purging and holding system designed at 110 kg/m3 – an 11,000 L tank system holding approx. 1,200 kg (1,100 animals) of southern rock lobster at 733 LPM, a 15-minute turnover
Key Equipment